Power plant · Portsmouth, England, United Kingdom

Lakeside Business Park

Lakeside Business Park is a battery storage plant under construction in Portsmouth, England, United Kingdom, with 2 MW of capacity, operated by Custom Solar Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationPortsmouth (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressWestern Road, Portsmouth, PO6 3PQDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusUnder constructionDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date1 Nov 2022 (permit 22/00487/FUL, Town and Country Planning Act, issued by Portsmouth)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date10 Jun 2022 (reference 22/00487/FUL, planning authority Portsmouth)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date1 Nov 2022 (granted, reference 22/00487/FUL, planning authority Portsmouth)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorCustom Solar LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity2 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (co-located with re)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates50.8393, -1.0721DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Construction started
  2. Permit granted (planning authority Portsmouth, reference 22/00487/FUL)
  3. Permit applied for (planning authority Portsmouth, reference 22/00487/FUL)

How it compares

Lakeside Business Park is the 1,435th-largest of 1,650 power plants planned, permitted or under construction in England and the 2,268th-largest of 2,548 in the United Kingdom by capacity; its 2 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,435th of 1,650171,264 MW<0.1%
United Kingdom2,268th of 2,548279,068 MW<0.1%
All power plants planned, permitted or under construction in our data5,488th of 5,799657,076 MW<0.1%

Nearby

Within 50 km of this power plant: 187 grid connections (108 operating, 926 MW), 152 substations, 7 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Wymering PrimarySubstation——0.7 km
Lakeside 1000 North Harbour grid connectionGrid connection5.07 MWPlanned0.8 km
Wymering BSPSubstation——0.8 km
Generation 15.96 MW grid connection at Northarbour RD GENGrid connection16 MWOperating1.0 km
Hilsea PrimarySubstation——1.4 km
Landfill gas 2.375 MW grid connection at PortchesterGrid connection2.38 MWOperating1.6 km
ServerHouseData center——6.7 km
SSE data center, HavantData center——7.4 km
Aquind InterconnectorTransmission line—Planned9.0 km

Operator and place

More from Custom Solar Limited

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page