Power plant · Amber Valley, England, United Kingdom

Hl Plastics Extrusions, Flamstead House Hall Road - Solar Panels

Hl Plastics Extrusions, Flamstead House Hall Road - Solar Panels is a permitted power plant in Amber Valley, England, United Kingdom, with 4.1 MW of capacity, operated by Custom Solar Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationAmber Valley (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressHL Plastics Extrusions Denby Hall Business Park - Flamstead House Hall Road Denby, DE5 8JXDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date23 Apr 2024 (permit PDR/2024/0008, Town and Country Planning Act, issued by Amber Valley)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date9 Feb 2024 (reference PDR/2024/0008, planning authority Amber Valley)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date23 Apr 2024 (granted, reference PDR/2024/0008, planning authority Amber Valley)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorCustom Solar LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity4.1 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.0306, -1.4074DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Amber Valley, reference PDR/2024/0008)
  2. Permit applied for (planning authority Amber Valley, reference PDR/2024/0008)

How it compares

Hl Plastics Extrusions, Flamstead House Hall Road - Solar Panels is the 1,704th-largest of 2,174 power plants planned, permitted or under construction in England and the 2,610th-largest of 3,222 in the United Kingdom by capacity; its 4.1 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,704th of 2,174185,888 MW<0.1%
United Kingdom2,610th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data5,756th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 74 substations, 62 grid connections (29 operating, 324 MW), 5 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Chesterfield to WillingtonTransmission line—Planned2.2 km
nLighten NottinghamData center——13 km
ExperianData center——24 km
DronfieldSubstation——30 km
Baslow RoadSubstation——33 km
GreenhillSubstation——33 km
Wind 20.22 MW grid connection at Pennyhill WindfarmGrid connection20.2 MWOperating34 km
Battery storage and Solar 35 MW grid connection at Bochum Parkway Combined TechGrid connection35 MWPlanned34 km
Battery storage and Solar 40 MW grid connection at Mansion House Farm BESSGrid connection40 MWPlanned34 km

Operator and place

More from Custom Solar Limited

Other power plants in England

All 5809 power plants in England, United Kingdom