RARE CONTEXT Request research

Grid connection · England, United Kingdom

(ANM) Stanground South Of Fletton Park grid connection

(ANM) Stanground South Of Fletton Park grid connection is a planned grid connection in England, United Kingdom, with 12 MW of capacity, held by Cambrideshire County Council.

Map: where (ANM) Stanground South Of Fletton Park grid connection lies
52.5499, -0.2304 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Peterborough Central 33kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusPlanned (accepted to connect)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderCambrideshire County CouncilUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Capacity12 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologySolarUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologyBattery storageUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Queue date17 Jun 2020UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date31 Oct 2030 (target energisation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage33 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates52.5499, -0.2304UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

How it compares

(ANM) Stanground South Of Fletton Park grid connection is the 1,720th-largest of 3,539 grid connections in England and the 2,440th-largest of 4,870 in the United Kingdom by capacity; its 12 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,720th of 3,539341,715 MW<0.1%
United Kingdom2,440th of 4,870467,981 MW<0.1%
All grid connections in our data6,026th of 8,6181,355,288 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 396 power plants (139 operating, 4,907 MW), 73 substations, 6 data centers and 3 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Kingston ParkPower plant1.8 MWCancelled0.9 km
Farcet Primary 11kVSubstation——1.5 km
J S Davidson Limited, Shrewsbury Avenue - Solar PV panelsPower plant1.44 MWPermitted2.0 km
Peterborough Central 11kVSubstation——2.1 km
Peterborough Central 33kVSubstation——2.2 km
Data center, England (OSM way 87850427)Data center——2.3 km
Fengate Industrial EstatePower plant174 MWCancelled2.6 km
Positive ParkData center——20 km
The Horizon CentreData center——28 km

Holder, grid operator and place

Other grid connections in England

All 4837 grid connections in England, United Kingdom

Data on this page