Power plant · Bassetlaw, England, United Kingdom

Hunciecroft Farm

Hunciecroft Farm is a power plant in Bassetlaw, England, United Kingdom, with 8 MW of capacity, operated by Solar Century and Magnetar Solar.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBassetlaw (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand North West Of Hunciecroft Farm Holbeck Lane Holbeck NottinghamshireDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2015DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date20 Nov 2014 (permit 14/01015/FUL, Town and Country Planning Act, issued by Bassetlaw)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date15 Aug 2014 (reference 14/01015/FUL, planning authority Bassetlaw)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date20 Nov 2014 (granted, reference 14/01015/FUL, planning authority Bassetlaw)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorSolar Century (Solar century / Magnetar Solar)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorMagnetar Solar (Solar century / Magnetar Solar)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity8 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area17.8 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.2609, -1.1847DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Hunciecroft Farm is the 1,342nd-largest of 3,430 power plants in England and the 2,176th-largest of 5,050 in the United Kingdom by capacity; its 8 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England1,342nd of 3,43071,985 MW<0.1%
United Kingdom2,176th of 5,050115,642 MW<0.1%
All power plants in our data7,598th of 12,0081,173,302 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Permit issued (Town and Country Planning Act), no. 14/01015/FUL
  2. Started operating

Nearby

Within 50 km of this power plant: 418 grid connections (100 operating, 1,042 MW), 152 substations, 7 data centers and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Hunciecroft Solar Farm grid connectionGrid connection——0.2 km
Creswell Solar Farm grid connectionGrid connection——1.9 km
Whitwell, Southfield Lane grid connectionGrid connection——2.0 km
Kiveton ParkSubstation——9.6 km
CosthorpeSubstation——13 km
DinningtonSubstation——13 km
Hive ITData center——23 km
UoS IT ServicesData center——24 km
ThalesData center——27 km

Operators and place

More from Solar Century

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page