Owner · Company
Magnetar Solar
Magnetar Solar operates 5 power plants in the United Kingdom.
Portfolio
The 5 assets and rights Magnetar Solar owns, operates or holds, by class, with its role in each. Sizes are the whole asset's, so they are not added up: the sources give no share for this owner.
Power plants 5
| Power plant | Location | Role | Capacity |
|---|---|---|---|
| Walkers Wood Solar Park | Bassetlaw, England, United Kingdom | Operator | 27 MW |
| Stowbridge Farm | East Cambridgeshire, England, United Kingdom | Operator | 24 MW |
| Aston House Solar Farm | Derbyshire Dales, England, United Kingdom | Operator | 20 MW |
| Welbeck Solar / Hazel Gap | Bassetlaw, England, United Kingdom | Operator | 16 MW |
| Hunciecroft Farm | Bassetlaw, England, United Kingdom | Operator | 8 MW |
By country
Where the assets and rights are.
- The United Kingdom5 power plants
Latest events
Dated events about Magnetar Solar and its assets from official notices and registers, newest first: the latest 8 of 15. All recent changes.
- Commissioned: Aston House Solar Farm
- Commissioned: Welbeck Solar / Hazel Gap
- Commissioned: Walkers Wood Solar Park
- Commissioned: Hunciecroft Farm
- Permit granted: Welbeck Solar / Hazel Gap (planning authority Bassetlaw, reference 14/01030/FUL)
- Permit granted: Hunciecroft Farm (planning authority Bassetlaw, reference 14/01015/FUL)
- Permit granted: Aston House Solar Farm (planning authority Derbyshire Dales, reference 14/00450/FUL)
- Permit granted: Walkers Wood Solar Park (planning authority Bassetlaw, reference 14/00681/FUL)
Partners and counterparties
Owners, operators and grid operators on the same assets.
- Solar Century4 shared
Research on Magnetar Solar.Its full portfolio, its parent companies, and an introduction to the people who decide on buying and selling.
Request researchData on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.