Power plant · Derbyshire Dales, England, United Kingdom

Aston House Solar Farm

Aston House Solar Farm is a power plant in Derbyshire Dales, England, United Kingdom, with 20 MW of capacity, operated by Solar Century and Magnetar Solar.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationDerbyshire Dales (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand At Aston House Farm, Aston Lane, Sudbury, Derbyshire, DE6 5HGDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2015DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date17 Nov 2014 (permit 14/00450/FUL, Town and Country Planning Act, issued by Derbyshire Dales)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date7 Jul 2014 (reference 14/00450/FUL, planning authority Derbyshire Dales)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date17 Nov 2014 (granted, reference 14/00450/FUL, planning authority Derbyshire Dales)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorSolar Century (Solar century / Magnetar Solar)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorMagnetar Solar (Solar century / Magnetar Solar)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity20 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area45.5 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.8824, -1.7401DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned
  2. Permit granted (planning authority Derbyshire Dales, reference 14/00450/FUL)
  3. Permit applied for (planning authority Derbyshire Dales, reference 14/00450/FUL)

How it compares

Aston House Solar Farm is the 573rd-largest of 3,430 power plants in England and the 1,079th-largest of 5,050 in the United Kingdom by capacity; its 20 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England573rd of 3,43071,965 MW<0.1%
United Kingdom1,079th of 5,050115,622 MW<0.1%
All power plants in our data3,931st of 12,0321,190,447 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating

Nearby

Within 50 km of this power plant: 15 grid connections (9 operating, 116 MW), 8 data centers, 8 substations and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Chesterfield to WillingtonTransmission line—Planned26 km
nLighten NottinghamData center——38 km
Internet Central data center, EnglandData center——38 km
ExperianData center——40 km
Ashwood DaleSubstation——43 km
Buxton 1 Battery grid connectionGrid connection16 MWOperating44 km
Waterswallows 1 Battery grid connectionGrid connection14 MWOperating44 km
Tunstead Stor 1 grid connectionGrid connection16 MWOperating44 km
WaterswallowsSubstation——45 km

Operators and place

More from Solar Century

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page