Power plant · North Yorkshire, England, United Kingdom
Hull Road, Lund - Battery Energy Storage System
Hull Road, Lund - Battery Energy Storage System is a permitted power plant in North Yorkshire, England, United Kingdom, with 40 MW of capacity, operated by Ylem Energy Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | North Yorkshire (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | West of Hulll Road, Lund, Selby, YO8 6PG | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 21 Jan 2025 (permit ZG2024/0630/FUL, Town and Country Planning Act, issued by North Yorkshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 23 Jul 2024 (reference ZG2024/0630/FUL, planning authority North Yorkshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 21 Jan 2025 (granted, reference ZG2024/0630/FUL, planning authority North Yorkshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Ylem Energy Limited | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 40 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (stand-alone storage) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 53.7822, -0.9989 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its operator? Ask us.
How it compares
Hull Road, Lund - Battery Energy Storage System is the 836th-largest of 2,174 power plants planned, permitted or under construction in England and the 1,342nd-largest of 3,222 in the United Kingdom by capacity; its 40 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 836th of 2,174 | 186,088 MW | <0.1% |
| United Kingdom | 1,342nd of 3,222 | 300,661 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 2,556th of 6,455 | 664,240 MW | <0.1% |
Nearby
Within 50 km of this power plant: 460 grid connections (222 operating, 2,693 MW), 310 substations, 6 data centers and 3 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Battery storage 40 MW grid connection at Greenacres Garth BESS | Grid connection | 40 MW | Planned | 0.1 km |
| Gas 35 MW grid connection at Gascoigne Wood | Grid connection | 35 MW | Operating | 2.0 km |
| Osgodby 3/4 | Substation | — | — | 2.2 km |
| Battery storage and Solar 82 MW grid connection at Spring Wood Hybrid | Grid connection | 82 MW | Planned | 2.5 km |
| Olympia Mills | Substation | — | — | 3.5 km |
| Selby | Substation | — | — | 4.5 km |
| Yorkshire GREEN | Transmission line | — | Permitted | 22 km |
| HSBC Wakefield Data Centre | Data center | — | — | 26 km |
| nLighten Leeds | Data center | — | — | 28 km |
Operator and place
Grid connections attached to this power plant
More from Ylem Energy Limited
- Cooksland Farm, Old Snydale -Battery Energy Storage50 MW · permitted
- Lovedean Lane - Battery Energy Storage System50 MW
- Wareham Road, Scouse Farm - Battery Storage50 MW
- Ardencaple Farm - Battery Storage50 MW
- Taigh An Struith, Tibbermore - Battery Energy Storage49.9 MW
- Dounreay, Thurso - Battery Energy Storage34 MW · under construction
- Caterham Bypass - Battery Energy Storage12 MW · permitted
- Airfield Farm - AD2 MW
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- Rare Context entity resolution. Rare Context entity resolution, CC0 1.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.