Power plant · Tandridge, England, United Kingdom

Caterham Bypass - Battery Energy Storage

Caterham Bypass - Battery Energy Storage is a permitted power plant in Tandridge, England, United Kingdom, with 12 MW of capacity, operated by Ylem Energy Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationTandridge (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressE/O Caterham Bypass, Caterham, CR3 6QWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date5 Sept 2024 (permit 2023/1430, Town and Country Planning Act, issued by Tandridge)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date27 Nov 2023 (reference 2023/1430, planning authority Tandridge)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date5 Sept 2024 (granted, reference 2023/1430, planning authority Tandridge)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorYlem Energy LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity12 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.2883, -0.0643DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Tandridge, reference 2023/1430)
  2. Permit applied for (planning authority Tandridge, reference 2023/1430)

How it compares

Caterham Bypass - Battery Energy Storage is the 1,412th-largest of 2,174 power plants planned, permitted or under construction in England and the 2,193rd-largest of 3,222 in the United Kingdom by capacity; its 12 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,412th of 2,174185,888 MW<0.1%
United Kingdom2,193rd of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data4,951st of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 132 data centers (1 operating, 88 MW), 93 substations, 37 grid connections (24 operating, 203 MW) and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Unit 3Data center——7.9 km
Unit 2Data center——8.0 km
Unit 1Data center——8.0 km
Solar 6.935 MW grid connection at Maiden NewtonGrid connection6.94 MWOperating25 km
Tertiary Study grid connectionGrid connection57 MWPlanned26 km
Harvard lane PrimarySubstation——27 km
Ariel Way White City London grid connectionGrid connection2.2 MWOperating27 km
Hope And Anchor PrimarySubstation——27 km
Southfield Road PrimarySubstation——28 km

Operator and place

More from Ylem Energy Limited

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page