Power plant · Wychavon, England, United Kingdom
Home Farm
Home Farm is a permitted power plant in Wychavon, England, United Kingdom, with 25 MW of capacity, operated by Canadian solar and Novergy.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Wychavon (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Land At Home Farm, Twyning Road, Strensham, Worcester, WR8 9LH | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 16 Jun 2025 (permit W/23/01011/FUL, Town and Country Planning Act, issued by Tewkesbury) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 27 Jun 2023 (reference W/23/01011/FUL, planning authority Tewkesbury) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 16 Jun 2025 (granted, reference W/23/01011/FUL, planning authority Tewkesbury) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Canadian solar (Canadian Solar / Novergy) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Novergy (Canadian Solar / Novergy) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 25 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Area | 66.7 ha (solar site area) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 52.0504, -2.1583 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its operator? Ask us.
How it compares
Home Farm is the 1,108th-largest of 2,174 power plants planned, permitted or under construction in England and the 1,741st-largest of 3,222 in the United Kingdom by capacity; its 25 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,108th of 2,174 | 186,088 MW | <0.1% |
| United Kingdom | 1,741st of 3,222 | 300,661 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 3,376th of 6,455 | 664,240 MW | <0.1% |
Nearby
Within 50 km of this power plant: 197 grid connections (11 operating, 248 MW), 15 substations and 3 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Home Farm grid connection | Grid connection | — | — | 1.3 km |
| West and East Sides of grid connection | Grid connection | — | — | 2.0 km |
| Lower Strensham PV grid connection | Grid connection | — | — | 2.1 km |
| Ionos data center, England | Data center | — | — | 17 km |
| Shipton Oliffe Primary | Substation | — | — | 25 km |
| DXC Technology | Data center | — | — | 30 km |
| Northleach Primary | Substation | — | — | 33 km |
| Evoque Data Center Solutions | Data center | — | — | 35 km |
| Rissington Primary | Substation | — | — | 36 km |
Operators and place
More from Canadian solar
- Green Man Road, Navenby - Battery Storage400 MW · planned
- Fosse Green Energy350 MW · planned
- Home Farm25 MW · permitted
- Wilsom Farm11 MW
- Land to the north and south of Cakers Lane (Wilsom)11 MW
- West Carclaze Solar Farm6.5 MW
- Pant-Y-Moch Farm5 MW
- Royston Solar Farm (Phase 1) (a)5 MW
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- NGED Connected Data portal. NGED Connected Data portal, Terms not verified.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.