Owner · Company
Canadian solar
Canadian solar operates 12 power plants in the United Kingdom.
Portfolio
The 12 assets and rights Canadian solar owns, operates or holds, by class, with its role in each. Sizes are the whole asset's, so they are not added up: the sources give no share for this owner.
Power plants 12
| Power plant | Location | Role | Capacity |
|---|---|---|---|
| Green Man Road, Navenby - Battery Storage | North Kesteven, England, United Kingdom | Operator | 400 MW |
| Fosse Green Energy | North Kesteven, England, United Kingdom | Operator | 350 MW |
| Home Farm | Wychavon, England, United Kingdom | Operator | 25 MW |
| Home Farm | Wychavon, England, United Kingdom | Operator | 25 MW |
| Land to the north and south of Cakers Lane (Wilsom) | East Hampshire, England, United Kingdom | Operator | 11 MW |
| Wilsom Farm | East Hampshire, England, United Kingdom | Operator | 11 MW |
| West Carclaze Solar Farm | Cornwall, England, United Kingdom | Operator | 6.5 MW |
| Pant-Y-Moch Farm | Neath Port Talbot, Wales, United Kingdom | Operator | 5 MW |
| Royston Solar Farm (Phase 1) | South Cambridgeshire, England, United Kingdom | Operator | 5 MW |
| Royston Solar Farm (Phase 1) (a) | South Cambridgeshire, England, United Kingdom | Operator | 5 MW |
| Royston Solar Farm (Phase 2) | South Cambridgeshire, England, United Kingdom | Operator | 4 MW |
| Land adjacent to Church Road | South Gloucestershire, England, United Kingdom | Operator | 3.5 MW |
By country
Where the assets and rights are.
- The United Kingdom12 power plants
Latest events
Dated events about Canadian solar and its assets from official notices and registers, newest first: the latest 8 of 30. All recent changes.
- Permit applied for: Fosse Green Energy (planning authority The Planning Inspectorate - National Infrastructure, reference EN010154)
- Permit granted: Home Farm (planning authority Tewkesbury, reference W/23/01011/FUL)
- Permit granted: Home Farm (planning authority Wychavon, reference 23/00499/FUL)
- Permit applied for: Green Man Road, Navenby - Battery Storage (planning authority North Kesteven, reference 25/0491/FUL)
- Permit applied for: Home Farm (planning authority Tewkesbury, reference W/23/01011/FUL)
- Permit applied for: Home Farm (planning authority Wychavon, reference 23/00499/FUL)
- Permit expired: Royston Solar Farm (Phase 1)
- Permit expired: Royston Solar Farm (Phase 2)
Partners and counterparties
Owners, operators and grid operators on the same assets.
- Novergy2 shared
- Windel Energy2 shared
- Fosse Green Energy Limited1 shared
Research on Canadian solar.Its full portfolio, its parent companies, and an introduction to the people who decide on buying and selling.
Request researchData on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.