Power plant · Stratford-on-Avon, England, United Kingdom

Middle Road Farm - Solar Farm & Battery Storage

Middle Road Farm - Solar Farm & Battery Storage is a permitted power plant in Stratford-on-Avon, England, United Kingdom, with 50 MW of capacity, operated by Novergy and Leicestershire Solar 1 Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationStratford-on-Avon (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressAdj Fosse Way and Middle Road Farm, Middle Road, Radford Semele, Leamington Spa, CV31DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date18 Aug 2023 (permit 23/01305/FUL, Town and Country Planning Act, issued by Stratford-on-Avon)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date5 May 2023 (reference 23/01305/FUL, planning authority Stratford-on-Avon)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date18 Aug 2023 (granted, reference 23/01305/FUL, planning authority Stratford-on-Avon)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorNovergy (Leicestershire Solar 1 Limited /Novergy)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorLeicestershire Solar 1 Limited (Leicestershire Solar 1 Limited /Novergy)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity50 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area89 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.2517, -1.4738DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Stratford-on-Avon, reference 23/01305/FUL)
  2. Permit applied for (planning authority Stratford-on-Avon, reference 23/01305/FUL)

How it compares

Middle Road Farm - Solar Farm & Battery Storage is the 478th-largest of 2,174 power plants planned, permitted or under construction in England and the 847th-largest of 3,222 in the United Kingdom by capacity; its 50 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England478th of 2,174185,888 MW<0.1%
United Kingdom847th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data1,927th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 24 grid connections (12 operating, 95.3 MW), 13 substations and 7 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Evoque Data Center SolutionsData center——29 km
Data center, England (OSM way 710050084)Data center——33 km
Deddington PrimarySubstation——33 km
Hill Farm PV grid connectionGrid connection4.51 MWOperating34 km
Duns TEW Solar Farm grid connectionGrid connection6 MWPlanned34 km
Spring Farm grid connectionGrid connection13.2 MWPlanned34 km
Chipping Norton PrimarySubstation——35 km
Hellermann Tyton DataData center——38 km
Kiddington PrimarySubstation——38 km

Operators and place

More from Novergy

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page