Power plant · North Somerset, England, United Kingdom
Garleys Wood Solar Park
Garleys Wood Solar Park is a cancelled power plant in North Somerset, England, United Kingdom, with 5 MW of capacity, operated by Wessex Solar Energy.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | North Somerset (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | The Oaks, Downside Road, Backwell, Bristol, Avon, BS48 3DQ | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Cancelled (planning permission refused) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 19 Sept 2012 (reference 12/P/1654/F, planning authority North Somerset) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 10 Dec 2012 (refused, reference 12/P/1654/F, planning authority North Somerset) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Wessex Solar Energy | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 5 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Area | 11.9 ha (solar site area) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 51.3934, -2.7144 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit refused (planning authority North Somerset, reference 12/P/1654/F)
- Permit applied for (planning authority North Somerset, reference 12/P/1654/F)
How it compares
Garleys Wood Solar Park is the 1,758th-largest of 3,430 power plants in England and the 2,742nd-largest of 5,050 in the United Kingdom by capacity; its 5 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,758th of 3,430 | 71,965 MW | <0.1% |
| United Kingdom | 2,742nd of 5,050 | 115,622 MW | <0.1% |
| All power plants in our data | 8,380th of 12,032 | 1,190,447 MW | <0.1% |
Nearby
Within 50 km of this power plant: 84 grid connections (52 operating, 470 MW), 36 substations, 10 data centers, 2 transmission lines and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Hinkley Point C Connection | Transmission line | — | Permitted | 7.8 km |
| Hinkley Point C Connection Project Material Change | Transmission line | — | Planned | 10 km |
| Insight Data Ltd | Data center | — | — | 14 km |
| nLighten Bristol | Data center | — | — | 19 km |
| University of Bristol Isambard-AI | AI supercomputer | 5,448 H100e | Operating | 20 km |
| Tata Communications Highbridge Datacentre | Data center | — | — | 25 km |
| Homewood Farm grid connection | Grid connection | 1 MW | Planned | 28 km |
| Holwell Primary | Substation | — | — | 31 km |
| Bradford-On-Avon Primary | Substation | — | — | 31 km |
Operator and place
More from Wessex Solar Energy
- Holt Lane Solar Park22 MW · planned
- Haddon Solar park22 MW
- Yellowham solar park20 MW
- Lodge Hill, Berkley - Solar Park14.5 MW · permitted
- Aborfield Solar Park14 MW · under construction
- Malmesbury Road Solar Farm13 MW · permitted
- Malmaynes Hall Farm12 MW
- Manor Farm12 MW · permitted
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Epoch AI. Epoch AI supercomputers, CC BY 4.0.
- JRC Open Power Plants Database (JRC-PPDB-OPEN), European Commission, Joint Research Centre. JRC Open Power Plants Database (JRC-PPDB-OPEN), CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Dutch power station owners' and operators' pages. Dutch power station owners' and operators' pages, Facts only, each linked to its page.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.