Power plant · New Forest, England, United Kingdom

Fletchwood Lane, Totton - Solar Park

Fletchwood Lane, Totton - Solar Park is a cancelled power plant in New Forest, England, United Kingdom, with 5.26 MW of capacity, operated by Trant Engineering Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNew Forest (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressFletchwood Lane, Totton, SO40 7DZDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date28 Jul 2025 (reference 25/00760FULL, planning authority New Forest)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date17 Mar 2026 (refused, reference 25/00760FULL, planning authority New Forest)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorTrant Engineering LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity5.26 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area13.5 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates50.9074, -1.5181DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (planning authority New Forest, reference 25/00760FULL)
  2. Permit applied for (planning authority New Forest, reference 25/00760FULL)

How it compares

Fletchwood Lane, Totton - Solar Park is the 1,736th-largest of 3,430 power plants in England and the 2,713th-largest of 5,050 in the United Kingdom by capacity; its 5.26 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England1,736th of 3,43071,965 MW<0.1%
United Kingdom2,713th of 5,050115,622 MW<0.1%
All power plants in our data8,333rd of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 215 grid connections (123 operating, 1,140 MW), 187 substations, 8 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Fletchwood PrimarySubstation——0.2 km
Fletchwood Solar Farm grid connectionGrid connection5 MWPlanned0.2 km
5.88MW BESS grid connectionGrid connection5.88 MWPlanned0.2 km
Totton PrimarySubstation——2.3 km
Land to the East of Marchwood Bypass grid connectionGrid connection49.9 MWPlanned3.2 km
Nursling GSPSubstation——4.3 km
Sky ChilworthData center——8.8 km
Regit4uData center——19 km
SCCData center——19 km

Operator and place

Grid connections attached to this power plant

Other power plants in England

All 5809 power plants in England, United Kingdom