Power plant · South Gloucestershire, England, United Kingdom

Elm Farm solar farm and Battery storage

Elm Farm solar farm and Battery storage is a cancelled power plant in South Gloucestershire, England, United Kingdom, with 24 MW of capacity, operated by Enso Energy Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationSouth Gloucestershire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand At Elm Farm Bristol Road Iron Acton, BS37 9TFDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date5 Jul 2021 (reference P21/04721/F, planning authority South Gloucestershire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date28 Jan 2022 (refused, reference P21/04721/F, planning authority South Gloucestershire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorEnso Energy LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity24 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area38.1 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.5482, -2.4742DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (planning authority South Gloucestershire, reference P21/04721/F)
  2. Permit applied for (planning authority South Gloucestershire, reference P21/04721/F)

How it compares

Elm Farm solar farm and Battery storage is the 501st-largest of 3,430 power plants in England and the 933rd-largest of 5,050 in the United Kingdom by capacity; its 24 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England501st of 3,43071,965 MW<0.1%
United Kingdom933rd of 5,050115,622 MW<0.1%
All power plants in our data3,392nd of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 112 grid connections (69 operating, 878 MW), 52 substations, 13 data centers, 2 transmission lines and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
University of Bristol Isambard-AIAI supercomputer5,448 H100eOperating5.6 km
nLighten BristolData center——7.5 km
Alderton PrimarySubstation——17 km
Castle Combe PV grid connectionGrid connection11.4 MWOperating19 km
Yatton Keynell PrimarySubstation——21 km
40MW grid connectionGrid connection40 MWPlanned22 km
Hullavington PV Farm grid connectionGrid connection6.65 MWOperating22 km
Spring Quarry West PrimarySubstation——23 km
Ark Data CentresData center——23 km

Operator and place

More from Enso Energy Limited

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page