Power plant · West Northamptonshire, England, United Kingdom

Crockwell Hill - Solar Farm

Crockwell Hill - Solar Farm is a planned power plant in West Northamptonshire, England, United Kingdom, with 6 MW of capacity, operated by PS Renewables.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationWest Northamptonshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressE/O Crockwell Hill, Watford Village, Daventry, NN11 2NEDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date16 Sept 2024 (reference 2024/4395/MAF, planning authority West Northamptonshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorPS RenewablesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity6 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area7.7 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.2948, -1.1312DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Crockwell Hill - Solar Farm is the 1,576th-largest of 2,174 power plants planned, permitted or under construction in England and the 2,433rd-largest of 3,222 in the United Kingdom by capacity; its 6 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,576th of 2,174186,088 MW<0.1%
United Kingdom2,433rd of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data5,556th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 324 grid connections (10 operating, 83.8 MW), 10 substations and 8 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Watford Gap Solar Farm grid connectionGrid connection——0.2 km
LL548-1 Watford Solar grid connectionGrid connection——1.5 km
Watford Lodge Windfarm Ltd grid connectionGrid connection——3.8 km
Hellermann Tyton DataData center——16 km
Santander data center, EnglandData center——32 km
Data center, England (OSM way 710050084)Data center——32 km
Cottisford PrimarySubstation——36 km
Deddington PrimarySubstation——38 km