Coxmoor Wood, Crondall Road - Battery Storage is a permitted battery storage plant in Hart, England, United Kingdom, with 57 MW of capacity, operated by Fleet Green Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationHart (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressNorth of Coxmoor Wood, off Crondall Road, Crookham Village, GU51 5SUDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date22 Apr 2024 (permit 23/00823/FUL, Town and Country Planning Act, issued by Hart)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date5 Apr 2023 (reference 23/00823/FUL, planning authority Hart)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date22 Apr 2024 (granted, reference 23/00823/FUL, planning authority Hart)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorFleet Green Limited (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity57 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.2615, -0.8631DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Hart, reference 23/00823/FUL)
  2. Permit applied for (planning authority Hart, reference 23/00823/FUL)

How it compares

Coxmoor Wood, Crondall Road - Battery Storage is the 358th-largest of 1,650 power plants planned, permitted or under construction in England and the 652nd-largest of 2,548 in the United Kingdom by capacity; its 57 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England358th of 1,650171,264 MW<0.1%
United Kingdom652nd of 2,548279,068 MW<0.1%
All power plants planned, permitted or under construction in our data1,692nd of 5,799657,076 MW<0.1%

Nearby

Within 50 km of this power plant: 247 substations, 200 grid connections (109 operating, 1,172 MW), 93 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Generation 100 MW grid connection at Bramley (Flee)Grid connection100 MWPlanned1.5 km
Battery storage 105.6 MW grid connection at FLEETGrid connection106 MWPlanned1.6 km
Coxmoor Wood BSPSubstation——1.6 km
Coxmoor Wood PrimarySubstation——1.7 km
Fleet-Bramley GSPSubstation——1.8 km
Eastbridge House grid connectionGrid connection59.5 MWPlanned2.3 km
Data center, England (OSM way 1164817477)Data center——5.0 km
Ark Data Centres data center, EnglandData center——5.1 km
Datum Farnborough Data CentreData center——5.1 km

Operator and place

Other power plants in England

All 5872 power plants in England, United Kingdom