Power plant · Wiltshire, England, United Kingdom

Cooles Farm, Minety - Solar Park/Battery Storage

Cooles Farm, Minety - Solar Park/Battery Storage is a planned power plant in Wiltshire, England, United Kingdom, with 8 MW of capacity, operated by Ecotricity Generation Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationWiltshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressCooles Farm, Minety, SN16 9QADESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date7 Nov 2022 (reference PL/2022/08634, planning authority Wiltshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorEcotricity Generation LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity8 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area12.5 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.6361, -1.9730DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority Wiltshire, reference PL/2022/08634)

How it compares

Cooles Farm, Minety - Solar Park/Battery Storage is the 1,529th-largest of 2,174 power plants planned, permitted or under construction in England and the 2,371st-largest of 3,222 in the United Kingdom by capacity; its 8 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,529th of 2,174185,888 MW<0.1%
United Kingdom2,371st of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data5,473rd of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 158 grid connections (94 operating, 1,165 MW), 94 substations, 10 data centers and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
The Barn - Solar PV grid connectionGrid connection3 MWPlanned0.8 km
Minety Village PrimarySubstation——1.1 km
Purlieus Battery Storage grid connectionGrid connection95 MWOperating2.2 km
DSO Charlton Park PV - 30MW grid connectionGrid connection30 MWPlanned2.6 km
Minety GSPSubstation——3.7 km
Kemble RAF PrimarySubstation——6.6 km
Nationwide Swindon Technology CentreData center——12 km
VodafoneData center——13 km
nLighten SwindonData center——17 km

Operator and place

More from Ecotricity Generation Limited

Other power plants in England

All 5809 power plants in England, United Kingdom