Power plant · Stroud, England, United Kingdom
Woodlands Farm, Clapton - Ground Mounted Solar Park
Woodlands Farm, Clapton - Ground Mounted Solar Park is a permitted power plant in Stroud, England, United Kingdom, with 36 MW of capacity, operated by Ecotricity Generation Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Stroud (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Woodlands Farm Woodlands Lane Clapton Berkeley, GL13 9QU | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 5 Aug 2025 (permit S.22/1955/FUL, Town and Country Planning Act, issued by Stroud) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 24 Oct 2022 (reference S.22/1955/FUL, planning authority Stroud) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 5 Aug 2025 (granted, reference S.22/1955/FUL, planning authority Stroud) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Ecotricity Generation Limited | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 36 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Area | 42.3 ha (solar site area) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 51.6807, -2.4859 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit granted (planning authority Stroud, reference S.22/1955/FUL)
- Permit applied for (planning authority Stroud, reference S.22/1955/FUL)
How it compares
Woodlands Farm, Clapton - Ground Mounted Solar Park is the 929th-largest of 2,174 power plants planned, permitted or under construction in England and the 1,469th-largest of 3,222 in the United Kingdom by capacity; its 36 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 929th of 2,174 | 185,888 MW | <0.1% |
| United Kingdom | 1,469th of 3,222 | 300,461 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 2,716th of 6,455 | 664,040 MW | <0.1% |
Nearby
Within 50 km of this power plant: 96 grid connections (59 operating, 794 MW), 38 substations, 11 data centers, 2 transmission lines and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| nLighten Bristol | Data center | — | — | 17 km |
| University of Bristol Isambard-AI | AI supercomputer | 5,448 H100e | Operating | 20 km |
| DXC Technology | Data center | — | — | 21 km |
| Alderton Primary | Substation | — | — | 23 km |
| Tetbury Primary | Substation | — | — | 24 km |
| Marsh Farm B PV grid connection | Grid connection | 11.4 MW | Operating | 27 km |
| Long Newton PV grid connection | Grid connection | 5.8 MW | Operating | 27 km |
| Sunstroom grid connection | Grid connection | 4.28 MW | Operating | 27 km |
| Malmesbury Primary | Substation | — | — | 28 km |
Operator and place
More from Ecotricity Generation Limited
- Butts Field, Mill Lane - Battery Storage99 MW · permitted
- Shilton Road - Solar Park8 MW · permitted
- Cooles Farm, Minety - Solar Park/Battery Storage8 MW · planned
- Butts Field Energy Storage grid connection99 MW
- Tinsley Farm grid connection5 MW
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Epoch AI. Epoch AI supercomputers, CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.