Power plant · Fylde, England, United Kingdom
Clifton Marsh Farm, Preston New Road - Solar Farm
Clifton Marsh Farm, Preston New Road - Solar Farm is a planned power plant in Fylde, England, United Kingdom, with 49.9 MW of capacity, operated by Vattenfall.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Fylde (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Clifton Marsh Farm, Preston New Road, Newton With Clifton, Preston, PR4 0XE | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Planned (planning application submitted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 22 Jul 2024 (reference 24/0414, planning authority Fylde) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Vattenfall | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 49.9 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Area | 68.7 ha (solar site area) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 53.7589, -2.8152 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit applied for (planning authority Fylde, reference 24/0414)
How it compares
Clifton Marsh Farm, Preston New Road - Solar Farm is the 514th-largest of 2,174 power plants planned, permitted or under construction in England and the 886th-largest of 3,222 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 514th of 2,174 | 185,888 MW | <0.1% |
| United Kingdom | 886th of 3,222 | 300,461 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 1,966th of 6,455 | 664,040 MW | <0.1% |
Nearby
Within 50 km of this power plant: 331 grid connections (185 operating, 1,699 MW), 281 substations, 10 data centers, 2 transmission lines and 1 gas storage facility, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Clifton Marsh Landfill Site grid connection | Grid connection | 6 MW | Planned | 0.0 km |
| Clifton Marsh grid connection | Grid connection | 49.9 MW | Planned | 0.1 km |
| UU Clifton Marsh WWTW grid connection | Grid connection | 1.99 MW | Planned | 0.9 km |
| Hall Cross | Substation | — | — | 4.1 km |
| Penwortham West / Stanah GSP | Substation | — | — | 4.2 km |
| Penwortham East / Rochdale SGT 1 GSP | Substation | — | — | 4.2 km |
| East Irish Sea Transmission Project | Transmission line | — | Planned | 14 km |
| Morgan and Morecambe Offshore Wind Farms Transmission Assets | Transmission line | — | Permitted | 16 km |
| Preesall Saltfield Underground Gas Storage | Gas storage facility | — | Cancelled | 19 km |
Operator and place
Grid connections attached to this power plant
More from Vattenfall
- Thanet (extension)340 MW
- Thanet300 MW
- South Kyle Wind Farm240 MW
- Pen Y Cymoedd228 MW
- Ormonde Offshore150 MW
- Aultmore Forest - Buckie - Windfarm106 MW · planned
- Ourack105 MW · permitted
- European Offshore Wind Deployment Centre (EOWDC) (Aberdeen Bay - Demonstration site)96.8 MW
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- Rare Context entity resolution. Rare Context entity resolution, CC0 1.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.