Grid connection · England, United Kingdom
UU Clifton Marsh WWTW grid connection
UU Clifton Marsh WWTW grid connection is a planned grid connection in England, United Kingdom, with 1.99 MW of capacity, connected by Electricity North West Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Name in the source | UU CLIFTON MARSH WWTW grid connection | SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Location | England (connects at Hall Cross) | SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Status | Planned (accepted to connect) | SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Attached to | Hall Cross (via a primary substation) | SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Attached to | Clifton Marsh Waste Water Treatment Works (matched by shared name+coordinates+technology+capacity, 0.59 km away) | Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026 |
| Capacity | 1.99 MW | SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Technology | Battery storage | SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Grid operator | Electricity North West Limited | SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Queue date | 21 Jan 2020 | SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Voltage | 6.6 kV | SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Coordinates | 53.7511, -2.8164 | SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026 |
Research on this grid connection and its grid operator.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the grid operator.
Request researchLatest events
Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.
- Commissioned: Clifton Marsh Waste Water Treatment Works
- Permit granted: Clifton Marsh Waste Water Treatment Works (planning authority Fylde, reference LCC/2019/0045)
- Permit applied for: Clifton Marsh Waste Water Treatment Works (planning authority Fylde, reference LCC/2019/0045)
How it compares
UU Clifton Marsh WWTW grid connection is the 2,211th-largest of 2,533 grid connections in England and the 3,415th-largest of 3,903 in the United Kingdom by capacity; its 1.99 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 2,211th of 2,533 | 319,370 MW | <0.1% |
| United Kingdom | 3,415th of 3,903 | 446,745 MW | <0.1% |
| All grid connections in our data | 7,423rd of 7,928 | 1,372,494 MW | <0.1% |
Nearby
Within 50 km of this grid connection: 332 power plants (106 operating, 1,710 MW), 287 substations, 12 data centers, 2 transmission lines and 1 gas storage facility, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Clifton Marsh Wwtw | Power plant | 4.5 MW | Cancelled | 0.5 km |
| Clifton Marsh Wastewater Treatment Works | Power plant | 1.3 MW | Operating | 0.5 km |
| Clifton Marsh Waste Water Treatment Works | Power plant | 2 MW | Operating | 0.6 km |
| Penwortham West / Stanah GSP | Substation | — | — | 4.1 km |
| Penwortham East / Rochdale SGT 1 GSP | Substation | — | — | 4.1 km |
| Hall Cross | Substation | — | — | 4.3 km |
| East Irish Sea Transmission Project | Transmission line | — | Planned | 15 km |
| Morgan and Morecambe Offshore Wind Farms Transmission Assets | Transmission line | — | Permitted | 16 km |
| Preesall Saltfield Underground Gas Storage | Gas storage facility | — | Cancelled | 20 km |
Grid operator and place
More from Electricity North West Limited
- The Albion Academy grid connection416 MW
- Heaten Hall Farm BESS grid connection240 MW
- Heaten Hall Farm BESS+Wind grid connection240 MW
- Houghton BESS grid connection240 MW
- Walney 2 Offshore Wind Farm grid connection183 MW
- Bolton Road grid connection179 MW
- WS Lamb 2 grid connection160 MW
- Ormonde Offshore Windfarm grid connection150 MW
Other grid connections in England
- Bute Hydrogen Project 1 grid connection4,800 MW
- Drax BECCS grid connection3,906 MW
- Drax Power Station grid connection3,906 MW
- Bute Hydrogen Project 2 grid connection3,600 MW
- Bute Hydrogen Project 3 grid connection3,600 MW
- Bute Hydrogen Project 5 grid connection3,600 MW
- Bute Hydrogen Project 6 grid connection3,600 MW
- Hinkley Point C grid connection3,340 MW
Data on this page
- California ISO. CAISO queue report, CAISO Privacy and Terms of Use.
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- Rare Context entity resolution. Rare Context entity resolution, CC0 1.0.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.