Power plant · Central Bedfordshire, England, United Kingdom
Clayhill Farm
Clayhill Farm is a power plant in Central Bedfordshire, England, United Kingdom, with 10 MW of capacity, operated by Anesco.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Central Bedfordshire (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | North Clayhill Farm, Greenfield Road, Westoning, Bedford, Bedfordshire, MK45 5JD | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Operating (operational) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Start year | 2016 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 29 Jan 2015 (permit CB/14/03419/FULL, Town and Country Planning Act, issued by Central Bedfordshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 1 Sept 2014 (reference CB/14/03419/FULL, planning authority Central Bedfordshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 29 Jan 2015 (granted, reference CB/14/03419/FULL, planning authority Central Bedfordshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Anesco | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 10 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Area | 36.2 ha (solar site area) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 51.9879, -0.4786 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchHow it compares
Clayhill Farm is the 1,102nd-largest of 3,430 power plants in England and the 1,838th-largest of 5,050 in the United Kingdom by capacity; its 10 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,102nd of 3,430 | 71,985 MW | <0.1% |
| United Kingdom | 1,838th of 5,050 | 115,642 MW | <0.1% |
| All power plants in our data | 7,057th of 12,008 | 1,173,302 MW | <0.1% |
Timeline
Dated facts about this power plant from its sources, oldest first.
- Permit issued (Town and Country Planning Act), no. CB/14/03419/FULL
- Started operating
Nearby
Within 50 km of this power plant: 120 grid connections (10 operating, 112 MW), 29 substations, 27 data centers (1 operating, 88 MW) and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Data center, Dunstable (OSM way 526426719) | Data center | — | — | 10 km |
| Milton Keynes, Woburn Sands grid connection | Grid connection | — | — | 12 km |
| River Island 1 grid connection | Grid connection | — | — | 14 km |
| 34130902 grid connection | Grid connection | — | — | 14 km |
| Starwood House | Data center | — | — | 19 km |
| Pulsant Milton Keynes SE-1 | Data center | — | — | 20 km |
| East Claydon GSP | Substation | — | — | 30 km |
| Cokes Lane Primary | Substation | — | — | 36 km |
| Amersham GSP | Substation | — | — | 38 km |
Operator and place
More from Anesco
- Persley BESS - Battery Storage70.1 MW · permitted
- Marston Sewerage Pumping Station, Bodymoor Heath Lane - Battery Storage50 MW · planned
- Newton Wood Farm49.9 MW · permitted
- Rothienorman - Battery Storage49.9 MW · permitted
- Turf Carr Solar Farm49.9 MW · permitted
- Overton Grange, Overton Road - Solar Farm Battery Energy Storage49.9 MW · planned
- Low Farm Solar Farm49.9 MW · under construction
- Brentwood nergy Storage System49.9 MW · permitted
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- NGED Connected Data portal. NGED Connected Data portal, Terms not verified.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.