Steeraway Farm - Solar Farm
Steeraway Farm - Solar Farm is a power plant under construction in Telford and Wrekin, England, United Kingdom, with 30 MW of capacity, operated by Enviromena.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Telford and Wrekin (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Steeraway Farm, Limekiln Lane, Wellington, Telford, TF1 2JU | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Under construction | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 9 May 2023 (permit TWC/2021/1071, Town and Country Planning Act, issued by Telford and Wrekin) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 28 Oct 2021 (reference TWC/2021/1071, planning authority Telford and Wrekin) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 9 May 2023 (granted, reference TWC/2021/1071, planning authority Telford and Wrekin) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 9 May 2023 (appeal granted, reference TWC/2021/1071, planning authority Telford and Wrekin) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 8 Apr 2022 (refused, reference TWC/2021/1071, planning authority Telford and Wrekin) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Enviromena | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 30 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Area | 53 ha (solar site area) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 52.6842, -2.5086 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its operator? Ask us.
How it compares
Steeraway Farm - Solar Farm is the 991st-largest of 2,174 power plants planned, permitted or under construction in England and the 1,569th-largest of 3,222 in the United Kingdom by capacity; its 30 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 991st of 2,174 | 186,088 MW | <0.1% |
| United Kingdom | 1,569th of 3,222 | 300,661 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 2,981st of 6,455 | 664,240 MW | <0.1% |
Nearby
Within 50 km of this power plant: 198 grid connections, 3 transmission lines and 3 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| The Fold grid connection | Grid connection | — | — | 1.7 km |
| Candles Landfill grid connection | Grid connection | — | — | 2.4 km |
| Lower Coalmoor Farm grid connection | Grid connection | — | — | 3.0 km |
| Reinforcement to North Shropshire Electricity Distribution Network | Transmission line | — | Permitted | 31 km |
| Hutchison 3G | Data center | — | — | 36 km |
| EE Data Centre | Data center | — | — | 37 km |
| Internet Central data center, England | Data center | — | — | 39 km |
| Mid Wales Electricity Connection (N Grid) | Transmission line | — | Cancelled | 41 km |
| Green Gen Vyrnwy Frankton | Transmission line | — | Planned | 46 km |
Operator and place
More from Enviromena
- Higher Bagmore Farm, Ebford Lane -Battery Energy Storage System50 MW · planned
- Engine Lane, Grimethorpe - Solar Farm49.9 MW · planned
- Stell Solar Farm30 MW · planned
- Wrotham Park - Solar Panels30 MW · planned
- South Carlton - Solar Panels29 MW · planned
- Tunstall & East Appleton Solar Farm - Solar Farm23.5 MW · planned
- St Mary in the Marsh - Solar Panels16 MW · planned
- Coal Pit Lane, Willey - Solar Farm16 MW · planned
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- NGED Connected Data portal. NGED Connected Data portal, Terms not verified.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.