Substation · England, United Kingdom
Crockerton Primary
Crockerton Primary is a substation in England, United Kingdom, connected by Southern Electric Power Distribution plc.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | England | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Grid operator | Southern Electric Power Distribution plc | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Demand headroom | 0 MVA | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Generation headroom | 0 MW | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Transformers | 2 x 10 / 14MVA | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Level | Primary | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Fed from | Melksham GSP | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Fed from | Frome BSP | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Congestion (offtake) | Full (red on the heat map, limited by substation thermal capacity) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Congestion (feed-in) | Full (red on the heat map, limited by upstream thermal capacity) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Voltage | 33 kV (levels 33/11 kV) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Coordinates | 51.1894, -2.1769 | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
Know more about this substation, or want an introduction to its grid operator? Ask us.
Nearby
Within 50 km of this substation: 376 power plants (172 operating, 1,909 MW), 305 grid connections (127 operating, 1,266 MW) and 2 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 8, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Summerslade Down Wind Cluster | Power plant | 2.2 MW | Cancelled | 5.4 km |
| Lodge Hill, Berkley - Solar Park | Power plant | 14.5 MW | Permitted | 7.9 km |
| Adams Hill Farm grid connection | Grid connection | 12 MW | Planned | 8.0 km |
| Northacre Resource Recovery Plant grid connection | Grid connection | 35.5 MW | Planned | 9.0 km |
| Northacre Industrial Park grid connection | Grid connection | 7.22 MW | Operating | 9.1 km |
| Westbury Landfill Scheme | Power plant | 1.1 MW | Operating | 9.3 km |
| Hinkley Point C Connection | Transmission line | — | Permitted | 45 km |
| Hinkley Point C Connection Project Material Change | Transmission line | — | Planned | 49 km |
Grid operator and place
More from Southern Electric Power Distribution plc
- Amersham GSPsubstation
- Loudwater BSPsubstation
- Bowerdean Primarysubstation
- Flackwell Heath Primarysubstation
- Well End Primarysubstation
- Wycombe Marsh Primarysubstation
- Axminster GSPsubstation
- Yeovil BSPsubstation
Other substations in England
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.