Power plant · Cheshire West and Chester, England, United Kingdom
Cheshire Power Station - Battery Storage Facility
Cheshire Power Station - Battery Storage Facility is a permitted power plant in Cheshire West and Chester, England, United Kingdom, with 45 MW of capacity, operated by RWE npower.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Cheshire West and Chester (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Cheshire Power Station North Road, Ellesmere Port, CH65 1AG | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 24 May 2023 (permit 21/04501/FUL, Town and Country Planning Act, issued by Cheshire West and Chester) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 4 Nov 2021 (reference 21/04501/FUL, planning authority Cheshire West and Chester) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 24 May 2023 (granted, reference 21/04501/FUL, planning authority Cheshire West and Chester) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | RWE npower | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 45 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (stand-alone storage) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 53.2984, -2.9090 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit granted (planning authority Cheshire West and Chester, reference 21/04501/FUL)
- Permit applied for (planning authority Cheshire West and Chester, reference 21/04501/FUL)
How it compares
Cheshire Power Station - Battery Storage Facility is the 811th-largest of 2,174 power plants planned, permitted or under construction in England and the 1,289th-largest of 3,222 in the United Kingdom by capacity; its 45 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 811th of 2,174 | 185,888 MW | <0.1% |
| United Kingdom | 1,289th of 3,222 | 300,461 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 2,422nd of 6,455 | 664,040 MW | <0.1% |
Nearby
Within 50 km of this power plant: 158 substations, 149 grid connections (89 operating, 629 MW), 16 data centers, 3 gas storage facilities and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| nLighten Chester | Data center | — | — | 6.1 km |
| nLighten Edge Data Centre Liverpool | Data center | — | — | 6.6 km |
| The Babbage Centre | Data center | — | — | 12 km |
| Bold GSP | Substation | — | — | 21 km |
| Unit 1 Junction Lane grid connection | Grid connection | 5.26 MW | Planned | 24 km |
| Amazon Man 8 grid connection | Grid connection | 1.39 MW | Planned | 25 km |
| Billinge Hill Quarry Landfill grid connection | Grid connection | 1.03 MW | Operating | 26 km |
| Newton Le Willows | Substation | — | — | 26 km |
| Haydock | Substation | — | — | 26 km |
Operator and place
More from RWE npower
- North Falls Offshore Wind Farm1,000 MW · permitted
- Stallingborough Combined Cycle Gas Turbine (CCGT) generating plant and Carbon Capture Plant (CCP)900 MW · planned
- Pembroke Power Station, Pwllcrochan - Battery Storage350 MW · permitted
- BOC Limited, Wholeflats Road - Green Hydrogen Electrolyser Plant200 MW · planned
- Pembroke Power Station, Pwllcrochan - Hydrogen Production Facility110 MW · permitted
- Allt Duine Wind Farm93 MW
- Rhyl Flats90 MW
- Rowantree Wind Farm69 MW
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.