Power plant · Torridge, England, United Kingdom

Chalhanger Farm Solar Park

Chalhanger Farm Solar Park is a cancelled power plant in Torridge, England, United Kingdom, with 6 MW of capacity, operated by Lightsource Renewable Energy.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationTorridge (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressChalhanger Farm Buckland Filleigh Beaworthy Devon, EX21 5JBDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (appeal refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date9 Apr 2013 (reference 1/0332/2013/FULM, planning authority Torridge)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date1 Jul 2014 (appeal refused, reference 1/0332/2013/FULM, planning authority Torridge)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date15 Jul 2013 (refused, reference 1/0332/2013/FULM, planning authority Torridge)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorLightsource Renewable EnergyDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity6 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates50.8556, -4.1934DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (appeal refused, planning authority Torridge, reference 1/0332/2013/FULM)
  2. Permit refused (planning authority Torridge, reference 1/0332/2013/FULM)
  3. Permit applied for (planning authority Torridge, reference 1/0332/2013/FULM)

How it compares

Chalhanger Farm Solar Park is the 1,612th-largest of 3,430 power plants in England and the 2,545th-largest of 5,050 in the United Kingdom by capacity; its 6 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England1,612th of 3,43071,965 MW<0.1%
United Kingdom2,545th of 5,050115,622 MW<0.1%
All power plants in our data8,103rd of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 1 data center, measured from the coordinates in the facts above.

NameKindSizeStatusDistance
Data center, England (OSM way 164113041)Data center——25 km