Power plant · South Gloucestershire, England, United Kingdom

Central Park - Solar Farm & Battery Storage

Central Park - Solar Farm & Battery Storage is a planned solar power plant in South Gloucestershire, England, United Kingdom, with 7 MW of capacity, operated by Severnside Distribution Lane Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationSouth Gloucestershire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressThe South Of Central Avenue Central Park Severnside, BS35 4DJDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date13 Jan 2026 (reference P26/00067/F, planning authority South Gloucestershire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorSevernside Distribution Lane Limited (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity7 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area8.73 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.5417, -2.6435DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority South Gloucestershire, reference P26/00067/F)

How it compares

Central Park - Solar Farm & Battery Storage is the 1,234th-largest of 1,650 power plants planned, permitted or under construction in England and the 1,982nd-largest of 2,548 in the United Kingdom by capacity; its 7 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,234th of 1,650171,264 MW<0.1%
United Kingdom1,982nd of 2,548279,068 MW<0.1%
All power plants planned, permitted or under construction in our data5,112th of 5,799657,076 MW<0.1%

Nearby

Within 50 km of this power plant: 78 grid connections (48 operating, 628 MW), 30 substations, 11 data centers, 2 transmission lines and 1 AI supercomputer, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
nLighten BristolData center——4.3 km
University of Bristol Isambard-AIAI supercomputer5,448 H100eOperating13 km
Hinkley Point C ConnectionTransmission line—Permitted25 km
Hinkley Point C Connection Project Material ChangeTransmission line—Planned26 km
Vantage Data Centers - CWL13Data center——27 km
Vantage Data Centers data center, NewportData center——27 km
Alderton PrimarySubstation——29 km
Castle Combe PV grid connectionGrid connection11.4 MWOperating30 km
Spring Quarry West PrimarySubstation——32 km

Operator and place

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page