Power plant · Cotswold, England, United Kingdom

Crucis Park

Crucis Park is a power plant in Cotswold, England, United Kingdom, with 12.5 MW of capacity, operated by Solar Planning.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCotswold (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressCrucis Park, Barnsley Road, Ampney Crucis, Cirencester, Gloucestershire, GL7 5DXDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2014DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date20 Dec 2013 (permit 13/03656/FUL, Town and Country Planning Act, issued by Cotswold)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date22 Aug 2013 (reference 13/03656/FUL, planning authority Cotswold)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date20 Dec 2013 (granted, reference 13/03656/FUL, planning authority Cotswold)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorSolar PlanningDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity12.5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area34 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.7245, -1.9103DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Crucis Park is the 900th-largest of 3,430 power plants in England and the 1,585th-largest of 5,050 in the United Kingdom by capacity; its 12.5 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England900th of 3,43071,985 MW<0.1%
United Kingdom1,585th of 5,050115,642 MW<0.1%
All power plants in our data5,978th of 12,0081,173,302 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Permit issued (Town and Country Planning Act), no. 13/03656/FUL
  2. Started operating

Nearby

Within 50 km of this power plant: 280 grid connections (89 operating, 1,145 MW), 108 substations and 10 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Crucis Park Estate LLP grid connectionGrid connection12.6 MWPlanned0.3 km
Crucis Park PV Farm grid connectionGrid connection14.3 MWOperating0.3 km
Cirencester PV grid connectionGrid connection9.5 MWOperating1.1 km
Cirencester Town PrimarySubstation——4.1 km
Whiteway PrimarySubstation——4.2 km
Cirencester BSPSubstation——4.4 km
Nationwide Swindon Technology CentreData center——18 km
nLighten SwindonData center——18 km
VodafoneData center——20 km

Operator and place

Grid connections attached to this power plant

More from Solar Planning

Other power plants in England

All 5809 power plants in England, United Kingdom