Power plant · North Yorkshire, England, United Kingdom

Broad Lane, Cawood - Solar Farm & Battery Storage

Broad Lane, Cawood - Solar Farm & Battery Storage is a planned power plant in North Yorkshire, England, United Kingdom, with 49.9 MW of capacity, operated by Quintas Cleantech.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationNorth Yorkshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressEast Of Broad Lane Cawood, YO8 3SQDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date7 Aug 2025 (reference ZG2025/0762/EIA, planning authority North Yorkshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorQuintas CleantechDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity49.9 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area87.5 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.8304, -1.1249DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority North Yorkshire, reference ZG2025/0762/EIA)

How it compares

Broad Lane, Cawood - Solar Farm & Battery Storage is the 514th-largest of 2,174 power plants planned, permitted or under construction in England and the 886th-largest of 3,222 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England514th of 2,174185,888 MW<0.1%
United Kingdom886th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data1,966th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 429 grid connections (216 operating, 2,591 MW), 324 substations, 7 data centers and 3 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Battery storage and Solar 64 MW grid connection at Cawood Hybrid DirectGrid connection64 MWPlanned1.0 km
Waste 3 MW grid connection at StillingfleetGrid connection3 MWOperating4.2 km
Waste 5.3 MW grid connection at StillingfleetGrid connection5.3 MWPlanned4.2 km
Olympia MillsSubstation——6.9 km
Fenton LaneSubstation——7.4 km
SherburnSubstation——7.5 km
Yorkshire GREENTransmission line—Permitted13 km
HSBC Wakefield Data CentreData center——22 km
nLighten LeedsData center——23 km

Operator and place

More from Quintas Cleantech

Other power plants in England

All 5809 power plants in England, United Kingdom

Data on this page