Power plant · North East Lincolnshire, England, United Kingdom
Bradley Road - Battery Energy Storage System
Bradley Road - Battery Energy Storage System is a permitted power plant in North East Lincolnshire, England, United Kingdom, with 10 MW of capacity, operated by Renewable Connections Developments Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | North East Lincolnshire (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | W/O Bradley Road, Grimsby, DN37 0AG | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 26 Apr 2024 (permit DM/1156/23/FUL, Town and Country Planning Act, issued by North East Lincolnshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 28 Nov 2023 (ref. DM/1156/23/FUL, North East Lincolnshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 26 Apr 2024 (granted, ref. DM/1156/23/FUL, North East Lincolnshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Renewable Connections Developments Limited | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 10 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 53.5473, -0.1194 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its operator? Ask us.
How it compares
Bradley Road - Battery Energy Storage System is the 1,441st-largest of 2,174 power plants planned, permitted or under construction in England and the 2,237th-largest of 3,222 in the United Kingdom by capacity; its 10 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,441st of 2,174 | 186,088 MW | <0.1% |
| United Kingdom | 2,237th of 3,222 | 300,661 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 5,307th of 6,455 | 664,240 MW | <0.1% |
Nearby
Within 50 km of this power plant: 230 grid connections (104 operating, 1,695 MW), 99 substations, 3 transmission lines and 1 CO2 emitter, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Western School PV grid connection | Grid connection | 1 MW | Operating | 1.3 km |
| Scartho | Substation | — | — | 1.9 km |
| Yarborough Road 132/33kV | Substation | — | — | 2.1 km |
| Yarborough Road 33/11kV | Substation | — | — | 2.2 km |
| Solar 16.3 MW grid connection at Low Farm Bradley Solar | Grid connection | 16.3 MW | Operating | 2.3 km |
| Solar 8 MW grid connection at Laceby Solar | Grid connection | 8 MW | Operating | 2.6 km |
| Aldbrough Hydrogen Storage | CO2 emitter | — | Planned | 29 km |
| Continental Link Multi-Purpose Interconnector | Transmission line | — | Cancelled | 34 km |
| Grimsby to Walpole | Transmission line | — | Planned | 35 km |
Operator and place
More from Renewable Connections Developments Limited
- Chads Farm - Photovoltaic Arrays & Battery Storage522 MW · planned
- Shuttleworth House, Higher Shuttleworth - Battery Energy Storage System100 MW
- Old Allen Road, Wilsden - Battery Energy Storage System99.9 MW · planned
- Summerway Drove, East Bower - Battery Storage90 MW · permitted
- Woodstock Road, Yarnton - Battery Energy Storage System52 MW · permitted
- Vicarage Drove - Solar farm & Battery storage49.9 MW · permitted
- Church Farm, Kingston On Soar - Solar Photovoltaic Farm49.9 MW · permitted
- Snakes Meadow - Solar Farm45.5 MW · permitted
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.