Power plant · County Durham, England, United Kingdom

Benridge Farm, Fillpoke Lane - Battery Energy Storage System

Benridge Farm, Fillpoke Lane - Battery Energy Storage System is a planned battery storage plant in County Durham, England, United Kingdom, with 12 MW of capacity, operated by Development at Benridge Farm.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCounty Durham (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressThe East South And W/O Benridge Farm, Fillpoke Lane, Blackhall Rocks, Hartlepool, TS27 4BTDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date18 Jul 2025 (reference DM/25/01964/FPA, planning authority County Durham)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorDevelopment at Benridge Farm (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity12 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (co-located with re)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates54.7342, -1.2732DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority County Durham, reference DM/25/01964/FPA)

How it compares

Benridge Farm, Fillpoke Lane - Battery Energy Storage System is the 1,134th-largest of 1,650 power plants planned, permitted or under construction in England and the 1,822nd-largest of 2,548 in the United Kingdom by capacity; its 12 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,134th of 1,650171,264 MW<0.1%
United Kingdom1,822nd of 2,548279,068 MW<0.1%
All power plants planned, permitted or under construction in our data4,598th of 5,799657,076 MW<0.1%

Nearby

Within 50 km of this power plant: 274 grid connections (137 operating, 1,359 MW), 164 substations and 5 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Benridge Solar grid connectionGrid connection60 MWPlanned1.9 km
Hulam Farm grid connectionGrid connection50 MWPlanned3.1 km
HartmoorSubstation——3.7 km
Hartmoor 66/20kVSubstation——3.7 km
Solar 42 MW grid connection at Sheraton SolarGrid connection42 MWPlanned3.9 km
Amberton RoadSubstation——5.6 km
DXC Wynyard Data CenterData center——11 km
Lumen Technologies data center, MiddlesbroughData center——17 km
Pulsant data center, EnglandData center——21 km