Power plant · North East Derbyshire, England, United Kingdom
Averhill Farm
Averhill Farm is a power plant in North East Derbyshire, England, United Kingdom, with 5 MW of capacity, operated by Lightsource Renewable Energy.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | North East Derbyshire (coordinates), England | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Averill Farm, Evershill Lane, Morton, Alfreton, DE55 6HB | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Operating (operational) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Start year | 2015 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 29 Sept 2015 (permit 15/00307/FL, Town and Country Planning Act, issued by North East Derbyshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 28 Apr 2015 (reference 15/00307/FL, planning authority North East Derbyshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 29 Sept 2015 (granted, reference 15/00307/FL, planning authority North East Derbyshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Lightsource Renewable Energy | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 5 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Area | 11.8 ha (solar site area) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 53.1488, -1.3840 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchHow it compares
Averhill Farm is the 1,758th-largest of 3,430 power plants in England and the 2,742nd-largest of 5,050 in the United Kingdom by capacity; its 5 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| England | 1,758th of 3,430 | 71,985 MW | <0.1% |
| United Kingdom | 2,742nd of 5,050 | 115,642 MW | <0.1% |
| All power plants in our data | 8,356th of 12,008 | 1,173,302 MW | <0.1% |
Timeline
Dated facts about this power plant from its sources, oldest first.
- Started operating
- Permit issued (Town and Country Planning Act), no. 15/00307/FL
Nearby
Within 50 km of this power plant: 417 grid connections (70 operating, 681 MW), 126 substations, 7 data centers and 3 transmission lines, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Morton, Padleywood Solar Farm grid connection | Grid connection | — | — | 0.2 km |
| Morton, Evershill Lane, Land North of Averill Farm grid connection | Grid connection | — | — | 0.8 km |
| Averill Farm grid connection | Grid connection | — | — | 0.8 km |
| Chesterfield to Willington | Transmission line | — | Planned | 14 km |
| Dronfield | Substation | — | — | 18 km |
| nLighten Nottingham | Data center | — | — | 19 km |
| Greenhill | Substation | — | — | 21 km |
| Jordanthorpe | Substation | — | — | 21 km |
| Hive IT | Data center | — | — | 26 km |
Operator and place
More from Lightsource Renewable Energy
- Montreathmont Moor Forest42 MW
- Goosehall Solar Farm39.5 MW
- Black Peak Farm31.8 MW
- Munceys Farm31.6 MW
- Netherfield Lane19.7 MW
- Six Hills Solar Farm18.7 MW
- Little Braxted Solar Park15 MW
- Tye Green Farm14.9 MW
Other power plants in England
- Walpole Flexible Generation Project2,000 MW
- Outer Dowsing Offshore Wind Farm1,500 MW
- Hornsea 2 - Optimus and Breesea1,320 MW
- Hornsea 1 - Heron & Njord1,218 MW
- Atlantic Array One - Bristol Channel Zone1,200 MW
- Five Estuaries - Wind Farm1,080 MW
- Rugeley Power Plant Conversion1,000 MW
- Teesworks Battery Storage Project1,000 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- NGED Connected Data portal. NGED Connected Data portal, Terms not verified.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.