Icewind Connah's Quay grid connection

Icewind Connah's Quay grid connection is a planned grid connection in Wales, United Kingdom, with 1,000 MW of capacity, held by Kari Energy Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationWales (connection site: Connah's Quay 400kV Substation)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (Scoping)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
HolderKari Energy LimitedNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Attached toIcewind Connah's QuayNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Capacity1,000 MWNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyWind OffshoreNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNational Grid Electricity Transmission plcNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date1 Nov 2033NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection gateGate 1NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

Icewind Connah's Quay grid connection is the 10th-largest of 277 grid connections in Wales and the 118th-largest of 4,493 in the United Kingdom by capacity; its 1,000 MW is 0.22% of the 459,551 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Wales10th of 27723,007 MW4.3%
United Kingdom118th of 4,493459,551 MW0.22%

Holder, grid operator and place

More from Kari Energy Limited

Other grid connections in Wales

All 591 grid connections in Wales, United Kingdom

Data on this page