Grid connection · Wales, United Kingdom

Awel Y Mor grid connection

Awel Y Mor grid connection is a planned grid connection in Wales, United Kingdom, with 1,100 MW of capacity, held by Awel y Mor Offshore Wind Farm Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationWales (connection site: Bodelwyddan 400kV Substation)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (Scoping)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
HolderAwel y Mor Offshore Wind Farm LimitedNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Attached toAwel Y MorNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Capacity1,100 MWNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyWind OffshoreNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNational Grid Electricity Transmission plcNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date1 Mar 2030NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

Awel Y Mor grid connection is the 6th-largest of 277 grid connections in Wales and the 93rd-largest of 4,493 in the United Kingdom by capacity; its 1,100 MW is 0.24% of the 459,551 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Wales6th of 27723,007 MW4.8%
United Kingdom93rd of 4,493459,551 MW0.24%

Holder, grid operator and place

Other grid connections in Wales

All 591 grid connections in Wales, United Kingdom

Data on this page