East Pit grid connection

East Pit grid connection is a planned grid connection in Wales, United Kingdom, with 750 MW of capacity, held by CS UK Holdings III Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationWales (connection site: Rhigos 400kV Substation)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (Scoping)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
HolderCS UK Holdings III LimitedNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Attached toEast PitNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Capacity750 MWNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyPV Array (Photo Voltaic/solar)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyEnergy Storage SystemNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorNational Grid Electricity Transmission plcNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date15 Oct 2037NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection gateGate 1NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

East Pit grid connection is the 15th-largest of 277 grid connections in Wales and the 259th-largest of 4,493 in the United Kingdom by capacity; its 750 MW is 0.16% of the 459,551 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Wales15th of 27723,007 MW3.3%
United Kingdom259th of 4,493459,551 MW0.16%