Grid connection · Scotland, United Kingdom

Stromar Offshore Windfarm grid connection

Stromar Offshore Windfarm grid connection is a planned grid connection in Scotland, United Kingdom, with 1,500 MW of capacity, held by Stromar Offshore Wind Farm Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationScotland (connects at Greens 400kV Substation)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (scoping)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
HolderStromar Offshore Wind Farm LimitedNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Attached toStromar Offshore WindfarmNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Capacity1,500 MWNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyWind OffshoreNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorScottish Hydro Electric Transmission plcNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date31 Dec 2035 (stage 2, cumulative 1,500 MW)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date31 Oct 2033 (stage 1, cumulative 1,000 MW)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

Stromar Offshore Windfarm grid connection is the 10th-largest of 1,192 grid connections in Scotland and the 40th-largest of 3,903 in the United Kingdom by capacity; its 1,500 MW is 0.34% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland10th of 1,19288,894 MW1.7%
United Kingdom40th of 3,903446,745 MW0.34%
All grid connections in our data62nd of 7,6161,281,251 MW0.12%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Stage 1 due to connect, 1,000 MW in total
  2. Stage 2 due to connect, 1,500 MW in total