Grid connection · Scotland, United Kingdom

Sandwick North Wind Generating Station grid connection

Sandwick North Wind Generating Station grid connection is a planned grid connection in Scotland, United Kingdom, with 5 MW of capacity, held by Xero Energy Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceSANDWICK NORTH WIND GENERATING STATION grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationScotland (connects at Stornoway Grid)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
HolderXero Energy LimitedSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toStornoway GSP (via a primary substation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity5 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyWindSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorScottish Hydro Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date13 Feb 2019SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date28 Feb 2031 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates58.1855, -6.4532SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

How it compares

Sandwick North Wind Generating Station grid connection is the 809th-largest of 1,192 grid connections in Scotland and the 2,582nd-largest of 3,903 in the United Kingdom by capacity; its 5 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland809th of 1,19288,894 MW<0.1%
United Kingdom2,582nd of 3,903446,745 MW<0.1%
All grid connections in our data6,544th of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 18 power plants (5 operating, 30.9 MW) and 11 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Arnish MoorPower plant3.9 MWOperating1.3 km
Stornoway GSPSubstation——2.6 km
Beinn Thulabaigh Wind TurbinePower plant5 MWCancelled2.8 km
Point Wind / Beinn Ghrideag FarmPower plant9 MWOperating3.1 km
Battery Point PrimarySubstation——5.1 km
Laxay PrimarySubstation——9.9 km

Holder, grid operator and place

Other grid connections in Scotland

All 1192 grid connections in Scotland, United Kingdom

Data on this page