Grid connection · Scotland, United Kingdom

Meall Buidhe grid connection

Meall Buidhe grid connection is a planned grid connection in Scotland, United Kingdom, with 40 MW of capacity, held by Muirden Energy.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceMEALL BUIDHE grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationScotland (connects at Shin Grid)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
HolderMuirden EnergySSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toShin Primary (via a primary substation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity40 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyWindSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorScottish Hydro Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date28 Feb 2023SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date31 Oct 2032 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates57.8697, -4.6333SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

How it compares

Meall Buidhe grid connection is the 348th-largest of 1,192 grid connections in Scotland and the 1,138th-largest of 3,903 in the United Kingdom by capacity; its 40 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland348th of 1,19288,894 MW<0.1%
United Kingdom1,138th of 3,903446,745 MW<0.1%
All grid connections in our data4,573rd of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 106 power plants (31 operating, 750 MW) and 50 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Glen Calvie Wind Farm, ArdgayPower plant69 MWCancelled3.4 km
Meall Buidhe Wind FarmPower plant40 MWPermitted6.2 km
Croick EstatePower plant4.6 MWCancelled9.3 km
Gledfield PrimarySubstation——15 km
Shin PrimarySubstation——15 km
Shin GSPSubstation——15 km

Holder, grid operator and place

More from Muirden Energy

Other grid connections in Scotland

All 1192 grid connections in Scotland, United Kingdom

Data on this page