Grid connection · Scotland, United Kingdom

Lochend Wind grid connection

Lochend Wind grid connection is a planned grid connection in Scotland, United Kingdom, with 8 MW of capacity, held by Wind Harvest Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceLOCHEND WIND grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationScotland (connects at Thurso South Grid)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
HolderWind Harvest LimitedSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toThurso South GSP (via a primary substation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity8 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyWindSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorScottish Hydro Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date15 Aug 2022SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date29 May 2028 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates58.5949, -3.2631SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

How it compares

Lochend Wind grid connection is the 740th-largest of 1,192 grid connections in Scotland and the 2,274th-largest of 3,903 in the United Kingdom by capacity; its 8 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland740th of 1,19288,894 MW<0.1%
United Kingdom2,274th of 3,903446,745 MW<0.1%
All grid connections in our data6,205th of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 127 power plants (33 operating, 590 MW) and 20 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Lochend Holding, Barrock - Wind FarmPower plant21 MWPlanned0.3 km
Lochend Holding, Barrock - Wind FarmPower plant10 MWPlanned0.3 km
Lochend Wind FarmPower plant9.2 MWOperating0.3 km
Hastigrow PrimarySubstation——7.3 km
Mount Pleasant PrimarySubstation——14 km
Thurso South GSPSubstation——15 km

Holder, grid operator and place

More from Wind Harvest Limited

Other grid connections in Scotland

All 1192 grid connections in Scotland, United Kingdom

Data on this page