Flotta Terminal grid connection is a grid connection in Scotland, United Kingdom, with 9.5 MW of capacity, held by Neo Next + Energy Resources UK Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Name in the source | FLOTTA TERMINAL grid connection | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Location | Scotland (connects at Scorradale) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Status | Operating (connected) | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Holder | Neo Next + Energy Resources UK Limited | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Capacity | 9.5 MW | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Technology | Wind | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Grid operator | Scottish Hydro Electric Power Distribution plc | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Voltage | 33 kV | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
| Coordinates | 58.8260, -3.1041 | SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026 |
Know more about this grid connection, or want an introduction to its holder? Ask us.
How it compares
Flotta Terminal grid connection is the 701st-largest of 1,192 grid connections in Scotland and the 2,171st-largest of 3,903 in the United Kingdom by capacity; its 9.5 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.
| Within | Rank | Total | Share |
|---|---|---|---|
| Scotland | 701st of 1,192 | 88,894 MW | <0.1% |
| United Kingdom | 2,171st of 3,903 | 446,745 MW | <0.1% |
| All grid connections in our data | 5,785th of 7,616 | 1,281,251 MW | <0.1% |
Nearby
Within 50 km of this grid connection: 123 power plants (39 operating, 511 MW) and 25 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| West Hill, Flotta | Power plant | 2 MW | Operating | 1.0 km |
| Flotta Primary | Substation | — | — | 1.6 km |
| Flotta | Power plant | 1.8 MW | Operating | 2.0 km |
| Lyness Primary | Substation | — | — | 6.1 km |
| Rysa Wind Energy Project | Power plant | 2.7 MW | Cancelled | 6.7 km |
| St Mary's Primary | Substation | — | — | 13 km |
Holder, grid operator and place
Other grid connections in Scotland
- Marram Wind Offshore Wind Farm grid connection3,000 MW
- OWPL Windfarm grid connection2,250 MW
- Caledonia Offshore Wind Farm grid connection2,000 MW
- Machair Offshore Wind Farm grid connection2,000 MW
- Arven Offshore Wind Farm grid connection1,800 MW
- Bellrock Offshore Wind Farm grid connection1,800 MW
- Earba PSH grid connection1,800 MW
- Glen Earrach PSH grid connection1,800 MW
Data on this page
- California ISO. Checked 2026-10-24. CAISO queue report, CAISO Privacy and Terms of Use.
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- SP Electricity North West, via Northern Powergrid Open Data. SP Electricity North West open data portal, CC BY 4.0.
- ERCOT GIS report. ERCOT GIS report, ERCOT Terms of Use.
- Supported by National Energy SO Open Data. NESO TEC Register, NESO Open Data Licence v1.0.
- Supported by Northern Powergrid Open Data. Northern Powergrid open data portal, Northern Powergrid Open Data Licence v1.0.
- NYISO interconnection queue. NYISO interconnection queue, Free reuse.
- PJM New Services Queue. PJM New Services Queue, Free reuse.
- SP Energy Networks, via Northern Powergrid Open Data. SP Energy Networks open data portal, CC BY 4.0.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.