Grid connection · Scotland, United Kingdom

Eday Tidal Developments grid connection

Eday Tidal Developments grid connection is a planned grid connection in Scotland, United Kingdom, with 4.8 MW of capacity, held by Stronsay Tidal Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceEDAY TIDAL DEVELOPMENTS grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationScotland (connection site: SCORRADALE)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (ACCEPTED TO CONNECT)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
HolderStronsay Tidal LimitedSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity4.8 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyMarineSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorScottish Hydro Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date25 Aug 2025SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date25 Aug 2026 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates59.1620, -2.7674SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

Eday Tidal Developments grid connection is the 828th-largest of 1,192 grid connections in Scotland and the 2,654th-largest of 3,903 in the United Kingdom by capacity; its 4.8 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland828th of 1,19288,894 MW<0.1%
United Kingdom2,654th of 3,903446,745 MW<0.1%
All grid connections in our data6,314th of 7,6161,281,251 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Connected

Nearby

Within 50 km of this grid connection: 45 power plants (16 operating, 45.2 MW) and 15 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Eday Tidal PrimarySubstation——2.0 km
Eday PrimarySubstation——2.6 km
Magallanes (FoW - EMEC)Power plant2 MWOperating3.0 km
SR-2000 (FoW - EMEC)Power plant2 MWOperating3.0 km
The Fall of Warness Tidal Scheme, (FoW - EMEC)Power plant2 MWPermitted3.0 km
Sanday PrimarySubstation——7.0 km