Grid connection · Scotland, United Kingdom

Coire Glas Pumped Storage grid connection

Coire Glas Pumped Storage grid connection is a grid connection in Scotland, United Kingdom, with 1,296 MW of capacity, held by Coire Glas Hydro Pumped Storage Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationScotland (connects at Coire Glas GSP)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
StatusPermitted (consents approved, stage 1)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (scoping, stage 2)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
HolderCoire Glas Hydro Pumped Storage LimitedNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Attached toCoire Glas Pumped StorageNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Capacity1,296 MWNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyPump StorageNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorScottish Hydro Electric Transmission plcNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date31 Oct 2029 (stage 1, cumulative 612 MW)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date31 Oct 2029 (stage 2, cumulative 1,296 MW)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

Coire Glas Pumped Storage grid connection is the 20th-largest of 1,192 grid connections in Scotland and the 78th-largest of 3,903 in the United Kingdom by capacity; its 1,296 MW is 0.29% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland20th of 1,19288,894 MW1.5%
United Kingdom78th of 3,903446,745 MW0.29%
All grid connections in our data132nd of 7,6161,281,251 MW0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Stage 1 due to connect, 612 MW in total
  2. Stage 2 due to connect, 1,296 MW in total

Holder, grid operator and place