Grid connection · Scotland, United Kingdom

Causeymire 2 Wind grid connection

Causeymire 2 Wind grid connection is a planned grid connection in Scotland, United Kingdom, with 39.6 MW of capacity, held by Beaufort Wind Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceCAUSEYMIRE 2 WIND grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationScotland (connects at Mybster Grid)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
HolderBeaufort Wind LimitedSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity39.6 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyWindSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorScottish Hydro Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date15 Mar 2024SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date30 Apr 2031 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates58.4428, -3.4976SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

Causeymire 2 Wind grid connection is the 356th-largest of 1,192 grid connections in Scotland and the 1,188th-largest of 3,903 in the United Kingdom by capacity; its 39.6 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland356th of 1,19288,894 MW<0.1%
United Kingdom1,188th of 3,903446,745 MW<0.1%
All grid connections in our data4,368th of 7,6161,281,251 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 119 power plants (32 operating, 1,517 MW) and 18 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Achlachan Wind Farm - Phase 2Power plant6.9 MWCancelled2.8 km
Achlachan Wind FarmPower plant10 MWOperating2.8 km
Halsary Wind FarmPower plant34 MWOperating3.5 km
Mybster 1 GSPSubstation——4.3 km
Mybster 2 GSPSubstation——4.4 km
Halkirk PrimarySubstation——6.8 km

Holder, grid operator and place

More from Beaufort Wind Limited

Other grid connections in Scotland

All 1192 grid connections in Scotland, United Kingdom

Data on this page