Grid connection · Scotland, United Kingdom

Cairnborrow Wind Energy Hub grid connection

Cairnborrow Wind Energy Hub grid connection is a planned grid connection in Scotland, United Kingdom, with 98.4 MW of capacity, held by BPUWL 29 Ltd.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceCAIRNBORROW WIND ENERGY HUB grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationScotland (connects at Cairnford)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
HolderBPUWL 29 LtdSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toCairnford GSP (via a primary substation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity98.4 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologyWindSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorScottish Hydro Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date25 Jul 2024SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Connection date31 Dec 2031 (target energisation)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates57.4524, -2.9223SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

How it compares

Cairnborrow Wind Energy Hub grid connection is the 74th-largest of 1,192 grid connections in Scotland and the 490th-largest of 3,903 in the United Kingdom by capacity; its 98.4 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland74th of 1,19288,894 MW0.11%
United Kingdom490th of 3,903446,745 MW<0.1%
All grid connections in our data3,363rd of 7,9281,372,494 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Due to connect

Nearby

Within 50 km of this grid connection: 183 power plants (57 operating, 790 MW) and 51 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
CairnborrowPower plant10 MWOperating2.1 km
Meikleton of ArdonaldPower plant1 MWPermitted3.4 km
Cairnford GSPSubstation——4.3 km
Edintore Wind FarmPower plant18 MWOperating6.5 km
Huntly PrimarySubstation——8.1 km
Keith PrimarySubstation——9.8 km

Holder, grid operator and place

Other grid connections in Scotland

All 1192 grid connections in Scotland, United Kingdom

Data on this page