Grid connection · Scotland, United Kingdom

Berwick Bank Offshore Wind Farm A grid connection

Berwick Bank Offshore Wind Farm A grid connection is a planned grid connection in Scotland, United Kingdom, with 1,380 MW of capacity, held by Berwick Bank A Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationScotland (connects at Branxton 400kV Substation)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (scoping)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
HolderBerwick Bank A LimitedNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Attached toBerwick Bank Offshore Wind Farm ANESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Capacity1,380 MWNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyWind OffshoreNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorSP Transmission plcNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date31 Oct 2029 (stage 2, cumulative 1,380 MW)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date31 Oct 2028 (stage 1, cumulative 1,150 MW)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

How it compares

Berwick Bank Offshore Wind Farm A grid connection is the 16th-largest of 1,192 grid connections in Scotland and the 64th-largest of 3,903 in the United Kingdom by capacity; its 1,380 MW is 0.31% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland16th of 1,19288,894 MW1.6%
United Kingdom64th of 3,903446,745 MW0.31%
All grid connections in our data105th of 7,9281,372,494 MW0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Stage 1 due to connect, 1,150 MW in total
  2. Stage 2 due to connect, 1,380 MW in total

Holder, grid operator and place

Other grid connections in Scotland

All 1192 grid connections in Scotland, United Kingdom