Grid connection · Scotland, United Kingdom

Alyth grid connection

Alyth grid connection is a planned grid connection in Scotland, United Kingdom, with 900 MW of capacity, held by Ecodev (Alyth) Ltd.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationScotland (connection site: Alyth Solar and Battery 400/132kV)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
StatusPlanned (Scoping)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
HolderEcodev (Alyth) LtdNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Attached toAlythNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Capacity900 MWNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyPV Array (Photo Voltaic/solar)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
TechnologyEnergy Storage SystemNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Grid operatorScottish Hydro Electric Transmission plcNESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date31 Oct 2033 (stage 2, cumulative 900 MW)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026
Connection date31 Oct 2029 (stage 1, cumulative 450 MW)NESO TEC Register · NESO Open Data Licence v1.0 · checked 24 Oct 2026

Know more about this grid connection, or want an introduction to its holder? Ask us.

How it compares

Alyth grid connection is the 34th-largest of 1,518 grid connections in Scotland and the 210th-largest of 4,493 in the United Kingdom by capacity; its 900 MW is 0.2% of the 459,551 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
Scotland34th of 1,51896,638 MW0.93%
United Kingdom210th of 4,493459,551 MW0.2%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Stage 1 due to connect, 450 MW in total
  2. Stage 2 due to connect, 900 MW in total

Holder, grid operator and place

Other grid connections in Scotland

All 1518 grid connections in Scotland, United Kingdom