Westmill Landfill Site grid connection is a grid connection in England, United Kingdom, with 2.3 MW of capacity, held by Biffa Waste Management Limited.

Map: where Westmill Landfill Site grid connection lies
51.8251, -0.0629 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Ware Primary 11kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusOperating (connected)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderBiffa Waste Management LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toWestmill Qaurry (matched by shared name+coordinates+technology+capacity, 0.66 km away)Rare Context entity resolution · CC0 1.0 · checked 25 Oct 2026
Attached toWare Primary 11kV (via a primary substation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Capacity2.3 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologyLandfill gasUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date1 Jan 2015UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage11 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.8251, -0.0629UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Latest events

Dated events about this grid connection and the records linked to it from official notices, registers and owners' press releases, newest first. All recent changes.

  1. Commissioned: Westmill Qaurry
  2. Permit granted: Westmill Qaurry (planning authority East Hertfordshire, reference 3/0416/-19)
  3. Permit applied for: Westmill Qaurry (planning authority East Hertfordshire, reference 3/0416/-19)

How it compares

Westmill Landfill Site grid connection is the 2,934th-largest of 3,539 grid connections in England and the 4,030th-largest of 4,870 in the United Kingdom by capacity; its 2.3 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England2,934th of 3,539341,715 MW<0.1%
United Kingdom4,030th of 4,870467,981 MW<0.1%
All grid connections in our data7,761st of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 506 substations, 442 power plants (160 operating, 4,118 MW), 95 data centers (1 operating, 88 MW), 1 AI supercomputer and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Westmill Quarry, Westmill Road - Solar FarmPower plant7.3 MWPlanned0.6 km
Westmill QaurryPower plant2.6 MWOperating0.7 km
Brazier Landfill SchemePower plant3.9 MWOperating1.2 km
Glaxo Primary 11kVSubstation——1.9 km
Ware Primary 11kVSubstation——2.8 km
East Hertford Primary 11kVSubstation——2.8 km
Hertfordshire Data CentreData center——8.7 km
Colt London North Data CentreData center——8.7 km
Google Datacentre Waltham CrossData center——14 km

Holder, grid operator and place

Other grid connections in England