Westcott Venture Park, Phase 2A and Phase 2B grid connection

Westcott Venture Park, Phase 2A and Phase 2B grid connection is a grid connection in England, United Kingdom, with 1.1 MW of capacity, held by Biffa Treatment Services Limited.

Map: where Westcott Venture Park, Phase 2A and Phase 2B grid connection lies
51.8443, -0.9577 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Waddesdon Primary 11kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusOperating (connected)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderBiffa Treatment Services LimitedUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toWaddesdon Primary 11kV (via a primary substation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toWestcott Venture Park Phase 2 & 3 (matched by shared name+coordinates+technology+capacity, 0.39 km away)Rare Context entity resolution · CC0 1.0 · checked 25 Oct 2026
Capacity1.1 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologySolarUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorEastern Power Networks plc (UK Power Networks, East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date9 Mar 2012UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage11 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.8443, -0.9577UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Latest events

Dated events about this grid connection and the records linked to it from official notices, registers and owners' press releases, newest first. All recent changes.

  1. Commissioned: Westcott Venture Park Phase 2 & 3
  2. Permit granted: Westcott Venture Park Phase 2 & 3 (planning authority Buckinghamshire, reference 11/00245/APP)
  3. Permit applied for: Westcott Venture Park Phase 2 & 3 (planning authority Buckinghamshire, reference 11/00245/APP)

How it compares

Westcott Venture Park, Phase 2A and Phase 2B grid connection is the 3,416th-largest of 3,539 grid connections in England and the 4,717th-largest of 4,870 in the United Kingdom by capacity; its 1.1 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England3,416th of 3,539341,715 MW<0.1%
United Kingdom4,717th of 4,870467,981 MW<0.1%
All grid connections in our data8,459th of 8,6181,355,288 MW<0.1%

Nearby

Within 50 km of this grid connection: 378 power plants (132 operating, 3,375 MW), 224 substations and 64 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Westcott Venture Park Solar FarmPower plant15 MWCancelled0.1 km
Westcott Venture Park Phase 2 & 3Power plant1.3 MWOperating0.4 km
Westcott Venture ParkPower plant2 MWOperating1.4 km
Waddesdon Primary 11kVSubstation——1.5 km
Coldharbour Farm 11kVSubstation——8.2 km
Buckingham Rd Primary 11kVSubstation——9.7 km
Data center, England (OSM way 1254986167)Data center——11 km
Data center, England (OSM way 1460602301)Data center—Under construction20 km
University Shared Data CentreData center——22 km