Wealden Works grid connection

Wealden Works grid connection is a planned grid connection in England, United Kingdom, with 21 MW of capacity, held by Britaniacrest Recycling.

Map: where Wealden Works grid connection lies
51.0996, -0.3197 on OpenStreetMap

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationEngland (connects at Horsham Grid 11kV)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
StatusPlanned (accepted to connect)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
HolderBritaniacrest RecyclingUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toHorsham Grid 11kV (via a primary substation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Attached toBritania Crest Recycling Limited - 3RS EfW Facilty (matched by coordinates+technology+capacity+company, 0.57 km away)Rare Context entity resolution · CC0 1.0 · checked 25 Oct 2026
Capacity21 MWUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
TechnologyWasteUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Grid operatorSouth Eastern Power Networks plc (UK Power Networks, South East England licence area)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Queue date30 Apr 2020UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Connection date31 Oct 2025 (target energisation)UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Voltage11 kVUK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026
Coordinates51.0996, -0.3197UK Power Networks open data portal · CC BY 4.0 · checked 25 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Latest events

Dated events about this grid connection and the records linked to it from official notices, registers and owners' press releases, newest first. All recent changes.

  1. Permit granted: Britania Crest Recycling Limited - 3RS EfW Facilty (appeal granted, planning authority Horsham, reference WSCC/015/18/NH)
  2. Permit granted: Britania Crest Recycling Limited - 3RS EfW Facilty (planning authority Horsham, reference WSCC/015/18/NH)
  3. Permit refused: Britania Crest Recycling Limited - 3RS EfW Facilty (planning authority Horsham, reference WSCC/015/18/NH)
  4. Permit applied for: Britania Crest Recycling Limited - 3RS EfW Facilty (planning authority Horsham, reference WSCC/015/18/NH)

How it compares

Wealden Works grid connection is the 1,296th-largest of 3,539 grid connections in England and the 1,889th-largest of 4,870 in the United Kingdom by capacity; its 21 MW is <0.1% of the 467,981 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,296th of 3,539341,715 MW<0.1%
United Kingdom1,889th of 4,870467,981 MW<0.1%
All grid connections in our data5,266th of 8,6181,355,288 MW<0.1%

Timeline

Dated facts about this grid connection from its sources, oldest first.

  1. Entered the connection queue
  2. Was due to connect; the register does not list it as connected

Nearby

Within 50 km of this grid connection: 380 substations, 214 power plants (85 operating, 1,134 MW) and 78 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Brookhurst Wood Gas to EnergyPower plant5.1 MWOperating0.4 km
Langhurst Wood Road - Hydrogen Generation FacilityPower plant2 MWCancelled0.4 km
Brookhurst Wood (Waste AD)Power plant4.5 MWOperating0.5 km
Horsham Grid 11kVSubstation——4.1 km
Southgate 11kVSubstation——8.2 km
IBM HorshamData center——9.0 km
Five Oaks PrimarySubstation——9.1 km
Digital Realty LGW15Data center——10 km
Digital Realty LGW16Data center——11 km

Holder, grid operator and place

More from Britaniacrest Recycling

Other grid connections in England

All 4837 grid connections in England, United Kingdom

Data on this page