Grid connection · England, United Kingdom

Upper PV Farm grid connection

Upper PV Farm grid connection is a grid connection in England, United Kingdom, with 7.52 MW of capacity, held by Upper Farm Solar Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceUPPER PV FARM grid connectionSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
LocationEngland (connects at Upper Farm PV)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
StatusOperating (connected)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
HolderUpper Farm Solar LimitedSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toAlton BSP (via a bulk supply point)SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toUpper Farm solar park (matched by name+coordinates+technology, 0.23 km away)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Capacity7.52 MWSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologySolarSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorSouthern Electric Power Distribution plcSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage33 kVSSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates51.1716, -1.0938SSEN Distribution data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its holder.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the holder.

Request research

Latest events

Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.

  1. Commissioned: Upper Farm solar park
  2. Permit granted: Upper Farm solar park (planning authority Basingstoke and Deane, reference 13/00653/FUL)
  3. Permit granted: Upper Farm solar park (appeal granted, planning authority Basingstoke and Deane, reference 13/00653/FUL)
  4. Permit refused: Upper Farm solar park (planning authority Basingstoke and Deane, reference 13/00653/FUL)
  5. Permit applied for: Upper Farm solar park (planning authority Basingstoke and Deane, reference 13/00653/FUL)

How it compares

Upper PV Farm grid connection is the 1,478th-largest of 2,533 grid connections in England and the 2,330th-largest of 3,903 in the United Kingdom by capacity; its 7.52 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England1,478th of 2,533319,370 MW<0.1%
United Kingdom2,330th of 3,903446,745 MW<0.1%
All grid connections in our data6,266th of 7,9281,372,494 MW<0.1%

Nearby

Within 50 km of this grid connection: 264 power plants (102 operating, 869 MW), 243 substations, 33 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Upper Farm solar parkPower plant12 MWOperating0.2 km
Preston Candover PrimarySubstation——2.6 km
Preston Farm, Preston Candover - Solar PV ArrayPower plant28 MWPermitted4.5 km
Herriard PrimarySubstation——4.6 km
Godsfield Solar FarmPower plant11.8 MWCancelled4.9 km
Jays Close PrimarySubstation——8.4 km
Data center, England (OSM way 1164817477)Data center——24 km
Ark Data Centres data center, EnglandData center——24 km
Datum Farnborough Data CentreData center——24 km

Holder, grid operator and place

Other grid connections in England

All 3831 grid connections in England, United Kingdom

Data on this page