Grid connection · England, United Kingdom

Turners Solar Farm grid connection

Turners Solar Farm grid connection is a planned grid connection in England, United Kingdom, with 23 MW of capacity, connected by Electricity North West Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
Name in the sourceTURNERS SOLAR FARM grid connectionSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
LocationEngland (connects at Blackburn)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
StatusPlanned (accepted to connect)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Attached toTurners Lane, Barnacre - Solar Farm (matched by shared name+coordinates+technology+capacity, 0.2 km away)Rare Context entity resolution · CC0 1.0 · checked 24 Oct 2026
Attached toBlackburn BSP (via a bulk supply point)SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Capacity23 MWSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
TechnologySolarSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Grid operatorElectricity North West LimitedSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Queue date13 Jun 2023SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Voltage132 kVSP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026
Coordinates53.8991, -2.7446SP Electricity North West open data portal · CC BY 4.0 · checked 24 Oct 2026

Research on this grid connection and its grid operator.Who holds it up to the parent company, the project behind it and its connection date, and an introduction to the grid operator.

Request research

Latest events

Dated events about this grid connection and the records linked to it from official notices and registers, newest first. All recent changes.

  1. Permit granted: Turners Lane, Barnacre - Solar Farm (planning authority Wyre, reference 23/00902/FULMAJ)
  2. Permit applied for: Turners Lane, Barnacre - Solar Farm (planning authority Wyre, reference 23/00902/FULMAJ)

How it compares

Turners Solar Farm grid connection is the 963rd-largest of 2,533 grid connections in England and the 1,550th-largest of 3,903 in the United Kingdom by capacity; its 23 MW is <0.1% of the 446,745 MW we hold for the United Kingdom. Ranks and totals cover the grid connections in our data that report their capacity, not every one in existence.

WithinRankTotalShare
England963rd of 2,533319,370 MW<0.1%
United Kingdom1,550th of 3,903446,745 MW<0.1%
All grid connections in our data5,135th of 7,9281,372,494 MW<0.1%

Nearby

Within 50 km of this grid connection: 267 power plants (92 operating, 1,224 MW), 225 substations, 2 transmission lines, 1 gas storage facility and 1 data center, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Turners Lane, Barnacre - Solar FarmPower plant23 MWPermitted0.2 km
East Irish Sea Transmission ProjectTransmission line—Planned2.0 km
GarstangSubstation——2.7 km
Dewlay Cheese Wind TurbinePower plant2 MWOperating2.8 km
Cross House Farm TurbinePower plant2 MWCancelled2.8 km
Catterall WaterworksSubstation——3.2 km
MoorsideSubstation——9.3 km
Preesall Saltfield Underground Gas StorageGas storage facility—Cancelled15 km
Morgan and Morecambe Offshore Wind Farms Transmission AssetsTransmission line—Permitted25 km

Grid operator and place

More from Electricity North West Limited

Other grid connections in England

All 3831 grid connections in England, United Kingdom